Conveyors and inspection gate in an automated logistics warehouse
HOME/05 Production Equipment/Equipment Verification
Production Equipment

Equipment Verification

Discover and fix operating scenario and logistics bottlenecks before actual operation

WHY

Why Is It Needed?

01 Before a factory and its equipment are actually built, it is hard to verify that process, equipment, and logistics scenarios work normally.
02 IT system-equipment integration and abnormal situations are hard to test in advance, so logistics congestion and system load problems are found during operation.

WHERE

Where Is It Used?

Target industries: displays, semiconductors, and manufacturing overall
Target Customers
Companies reviewing automation investment direction ahead of new factory/line construction or expansion
KEY CAPABILITIES

Key Capabilities

01 Verification Targets
Process/equipment/logistics operating scenarios, equipment specifications, I/F specifications Data / logic / system infrastructure RTD / MES / MCS / CIM systems
02 Verification Items
Verify normal operation based on operating scenarios Check logistics flow and predict congestion points Predict system impact Pre-verify integrated system performance and load Verify integrated control monitoring visualization screens
03 Verification Method
Data-based simulation verification of equipment operation and IT system integration across various targets (equipment/I/F specifications, scenarios, systems, infrastructure) and verification items
MODULES

Automation Equipment Build Process

AS-IS
Planning / Requirements Definition
Basic Design
Detailed Design
Ordering / Fabrication
FAT
On-site Installation
Commissioning to Operation
TO-BE
Production plan Operating plan Equipment specifications Work method
Equipment Verification · Simulation Result analysis · Design reflection
IMPACT

Benefits

01
Verify production capacity and identify bottleneck processes → Increase output through process improvement
02
Verify logistics equipment capacity and calculate the right number of units → Reduce investment cost
03
Optimize logistics flow → Higher process equipment utilization, higher logistics throughput
CUSTOMER VOICE

Voice of the Customer

"Pre-verifying system logic and performance greatly shortened our setup testing and ramp-up period."
Production Manager, Battery Manufacturer
"By testing in advance a scenario where logistics volume doubled, we found the cause of logistics congestion and even solved batch delay issues beforehand."
Production Manager, Battery Manufacturer
WHY LG CNS

Why LG CNS

01 Systematic smart factory blueprint

Goes beyond setting a direction, specifying equipment concept specifications, design drawings, and operating scenarios along with investment costs and expected benefits. Provides a phased implementation plan for actual build-out and future expansion.

02 References across diverse manufacturing sites

Drawing on experience at diverse manufacturing sites and equipment operations, designs an automation blueprint that integrates equipment, systems, and operations rather than being limited to individual equipment or processes.

03 AX/RX-based concept design

Based on AX/RX technology, analyzes equipment automation levels and operating data to design a next-generation automation concept optimized for productivity and quality.

REFERENCE

References

Move to top