Factova WorldWorks — Design · Commissioning · Operation & Monitoring
HOME/01 Design, Digital Factory Engineering & Operations/Factova Worldworks_Logistic Simulation
Design, Digital Factory Engineering & Operations

Factova Worldworks_Logistic Simulation

Quickly design factory layouts with optimized area and material flow using AI algorithms

WHY

Why Is It Needed?

Layout design is time-consuming when building a new factory or changing production lines. The more processes and equipment, the more combinations grow exponentially, so finding the optimal layout takes a lot of trial and error and time.

Factova Logistic Simulation is LG CNS's factory layout design automation system, quickly and accurately generating optimal layout options even in complex manufacturing environments.

VIDEO

Factova WorldWorks at a Glance

WHERE

Where Is It Used?

Target Industries
Any industry with complex automation systems and production processes made up of diverse equipment and manufacturing lines
Target Customers
Companies planning new factory design, line expansion, or layout changes
KEY CAPABILITIES

Factova Logistic Simulation Key Capabilities

01 Intuitive Process Scenario Setup
Build layout scenarios with drag and drop Set combinations of variables such as output, equipment count, and workers Recreate a virtual process identical to the site using real data
02 What-if Simulation
Freely test a variety of process scenarios Verify improvements in productivity, efficiency, and bottlenecks
03 AI-Based Bottleneck Analysis & Optimization
Automatically detects and analyzes bottleneck sections and resource imbalances Proposes optimization scenarios and generates reports automatically Calculates key metrics such as output and cycle time in real time
04 LLM-Based Simulation
Create and edit scenarios in natural language User-friendly simulation environment
IMPACT

Benefits

Operational optimization without additional equipment investment
Tact Time
15% Reduced
By optimizing logistics transfer processing
Production stoppage time
27% Reduced
01
Logistics capacity secured
02
Iterative drawing design
03
Design effort reduction
04
Quantitative drawing evaluation
CUSTOMER VOICE

Voice of the Customer

"The AI algorithm gave us creative, diverse layout options that weren't in our references, so we could choose the optimal one."
Design Lead, Battery Company A
WHY LG CNS

Why LG CNS

01 Meta-heuristic Layout Engine

Factory layout design is an NP-hard problem, making it very difficult to find the optimal solution. Factova uses meta-heuristic algorithms to derive optimal or near-optimal layouts.

Parallel processing generates multiple design options at once, dramatically speeding up design that takes 5-7 days by hand.

02 Integrated FA Layout + Construction Layout

Designs production equipment (FA), auxiliary rooms, buildings, and site layout in one flow, integrating spatial constraints, process sequence, and logistics flow.

03 Quantitative Scoring & Automatic Drawing Generation

Scoring on area, material flow, and investment cost derives the optimal option (Cost Saving), and results are generated automatically as DXF files that convert instantly into CAD drawings.

REFERENCE

References

Move to top